Back-pressure turbine Manufacturer: Fa. KKK First Start-up: 2002 Operating Hours of Turbine: 30,000h Type: CFR5 G6a Power Max: 2500 kW Operational efficiency: 2200 kW Revolution number: 23000 rpm Live steam pressure: 65 bar Live steam pressure temperature: 480 oC Evaporation pressure: 1-17 bar Investments in the year 2002 Entire steam transforming station from 63 bar to 2.5 bar renewed in 2002, El. Generator Leroy Somer, el. Power 2 MW Renewed measuring Entire -, governing and control of the turbine renewed Steam turbine renewed Installed boiler efficiency: Boiler I Hard coal Steam generation: 20 t/h, 63 bar, 495 oC Boiler II Hard coal Steam generation: 13 t/h, 34 bar, 425 oC Boiler III: Combination burner for oil and gas Steam generation: 20 t/h, 17 bar, 285 oC General overhaul of the entire plant from 2002 to 2004 Steam generator renewed automatic cole-loader ...
Turbine Turbine mileage: 30,000 hours Counter-pressure turbine Manufacturer KKK Initial commissioning in 2002 Type: CFR5 G6a Power Max: 2500 kW Operating power: 2200 kW, Speed 23000 rpm, Fresh steam pressure: 65 bar, Fresh steam pressure temperature: 480 C, Evaporation pressure: 1-17 bar, Investments in 2002, Total steam forming station renewed from 63 bar to 2.5 bar in 2002, El. Generator Leroy Somer, el. Power 2 MW, 525 V, 2488 kVA renewed, Complete measuring, control, control technology of the turbine renewed, steam turbine renewed With Energy Installed boiler power Boiler I Coal Steam generation: 20 t/h, 63 bar, 495 C Boiler II Coal Steam generation: 13 t/h, 34 bar, 425 C Boiler III: Combined burner for oil and gas, steam generation: 20 t/h, 17 bar, 285 C General overhaul of the entire plant from 2002 to 2004, steam generator renewed, automatic charcoal and ...